⚡ TaskFlow + New

Task Board

53 total tasks

Completed 19 Mar 2026
Ensuring Till 1 in Imart Pioneer is having POS it can both sell and Back Management setting up

Ensuring Till 1 in Imart Pioneer is having POS it can both sell and Back Management setting up

Req: Isaac Assigned: Zack
0
Completed 18 Mar 2026
Realignment of Karibu Hotel camera

Realignment of camera 1 it was not showing all parts of the hotel

Req: MASIKA Assigned: ZACKIE
0
In Progress 10 Mar 2026
Realignment of Cameras to. Subnet 192.168.2.xxx

This process ensures all cameras are visible to the network not all cameras were visible

Req: Steve
0
In Progress 28 Mar 2026
PC AT Pioneer Can Not Start
Req: Tracie Assigned: Zack
0
Completed 25 Mar 2026
Registration Of New Sim for Karibu Hotel SMS Not Working

Masika Reregistring to the System

Req: Steve Assigned: Zack
0
Completed
Reinstallation of Cameras To Pioneer Supermarket
Req: Steve Assigned: Zack
0
Pending
Vedio Editing Of Karibu Hotel Advertising Campaign
Req: Perris Assigned: Zack
1
Completed
Installation of Mawingu Wifi In Express
Req: Masika Assigned: Zack
0
TaskFlow

Designed & built with care by Zack Orengo  ·  2026

Laravel 11 · v1.0