⚡ TaskFlow + New

Task Board

51 total tasks

Pending 08 Apr 2026
Prepared invoice for imart Pioneer mawingu Payment

Internet subscription renewal

Req: Tracy Assigned: Zack
0
Completed 07 Apr 2026
IMART Wanzuu server was running slow Restarted

I restarted the server ,it improved performance

Req: Steve Assigned: Zack
0
Completed 07 Apr 2026
Repair Till 1 and Till2 IMART Express

Sms not working, screen flickering user support for both

Req: Dorothy, Juddy Assigned: Zack
0
Completed 07 Apr 2026
EXTENSION REPAIR CONNETED TO Ecoflow

Eco flow is overwhelmed by Fridge it burned one socket of the ECO flow

Req: MUL Assigned: Zack
0
In Progress 02 Apr 2026
Repair Store Server With Steve Ensure Products Sent to store are Recieved

Repair Store Server With Steve Ensure Products Sent to store are Recieved

Req: Steve Assigned: Zack
0
Completed 01 Apr 2026
Repair Karibu Hotel Till

Repair Karibu Hotel Till With Steve

Req: Christine Assigned: Zack
0
Completed 30 Mar 2026
Wifi ,Server in Community Store and Camera are working

Wifi ,Server in Community Store and Camera are working

Req: Emma Assigned: Zack
0
Pending 30 Mar 2026
Internet at Pioneer and Cocacola

Confirmation that internet works in pioneer and imart

Req: Masika Assigned: Zack
0
Cancelled 30 Mar 2026
Coming Up With Poster Muffin, queen cake and burns.

Zack To come upp with Muffin Queen Cake and Burn Posters

Req: Steve Assigned: Zack
0
Completed 02 Mar 2026
Realignment of Imart Express Camera
Req: MASIKA Assigned: Zack
0
Completed 19 Mar 2026
Ensuring Till 1 in Imart Pioneer is having POS it can both sell and Back Management setting up

Ensuring Till 1 in Imart Pioneer is having POS it can both sell and Back Management setting up

Req: Isaac Assigned: Zack
0
Completed 18 Mar 2026
Realignment of Karibu Hotel camera

Realignment of camera 1 it was not showing all parts of the hotel

Req: MASIKA Assigned: ZACKIE
0
TaskFlow

Designed & built with care by Zack Orengo  ·  2026

Laravel 11 · v1.0